If you’re underwriting a build or waiting on a home, the schedule isn’t a detail — it’s money and it’s patience. Here’s where Wichita lands against the country, permit to keys:

BIDS, PERMIT TO KEYS
<120 days
MOST BIDS JOBS
<100 days
U.S. AVERAGE
9.1 months
U.S. RENTAL BUILD
12.5 months

Under four months on our side, against nine on average across the country — and closer to three times faster than the national rental-home build. That gap is the whole story, so it’s worth being honest about both numbers.

The honest national number

Across the U.S., a single-family home now takes about 9.1 months from permit to completion, per the Census Bureau’s Survey of Construction — roughly 1.4 months waiting to start and 7.6 months building. Homes built for sale are the quickest at 7.6 months; rental homes run about 12.5 months, and owner-built homes stretch past 15. And it’s the wrong direction: the average is nearly two months longer than it was a decade ago, thanks to permitting, labor, and material friction.

Nine months is the country’s baseline, not its worst case. That’s the bar an efficient builder has to beat by a wide margin to be worth anything to you.

We deliver in under 120 days

Bids builds permit-to-keys in under 120 days — the majority under 100. Against the national rental-home timeline, that’s roughly a third of the calendar. It isn’t a shortcut and it isn’t corner-cutting; it’s the same Deming discipline that holds our budgets: a schedule built from the trades up, sequenced so nothing waits on nothing, run the same way on every job until the plan and the actual are the same document.

Repetition is what makes it repeatable. Build the same duplex enough times and you stop discovering the schedule and start executing it — the delays other builders treat as weather, we treat as a process problem we already solved.

Speed at the expense of quality is just a faster way to lose. Speed as a byproduct of a system you’ve run a hundred times is the opposite — it’s the proof the system works.

I’ve watched a deal go the other way

One of my best clients — decades together, a lot of mediocre subcontractors and superintendents fired side by side — was two weeks from breaking ground on the largest syndication of his career: three sites, financed at 4.5%, a nine-month build. At the last minute he got anxious about the number and handed the job to a cheaper GC.

Rates on the stalled project climbed to 9%. Nine months turned into eighteen. At the twenty-month mark, not one door had been rented or sold. That’s when he called: “This was the worst mistake of my life.”

The cheaper GC didn’t save him a dollar — it cost him the deal. He didn’t buy a lower price; he bought a builder who couldn’t hold the schedule or the standard — and every month of that showed up as interest owed and units sitting empty.

Why speed is yield, not a vanity metric

For an investor, every extra month of construction is carry — loan interest, taxes, insurance, overhead — on a building earning nothing yet. It’s also a month of rent you never collect. Cut the build from twelve months to four and you’ve erased eight months of carry and pulled eight months of rent forward, on every unit. That flows straight into the yield on cost that makes new build-to-rent here pencil.

Which is why the schedule belongs in the underwriting, not the fine print. A builder who actually holds his timeline isn’t doing you a favor — he’s protecting the return you signed up for.

The numbers are real. Whether a deal holds is another question. A strong pro forma in the wrong hands still loses money — and a build that runs long is one of the fastest ways it happens. Seeing the trouble before it starts is the part no spreadsheet gives you. That’s the job.
How these numbers are sourced. Bids’ permit-to-keys timelines are our own, across completed Wichita projects, current as of 2026. National build-time figures are the U.S. Census Bureau’s Survey of Construction, linked inline.
Bids Contracting LLC · General Contractor · Wichita, KSEST. WICHITA